4X250MW Hydro Units are Connected to Indian Grid through 2X400KV Transmission Lines. Is it required from protection to trip the breaker of the unis running in parallel when total load throw off occurs/both the transmission lines are tripped.

Further, I may please be enlightened on which system disturbance conditions Unit Breakers should open.
 